Infrastructure

INFRASTRUCTURE

      

 The vidyalaya has been established initially in Local school Premises, in the temporary structures,i.e., Hutatma Bahirji Smarak Vidyalya, Basmatnagar, in the year 1987. Then with the help of local Government administration, vidyalaya administration was able to get 30 acres of Land  on  lease on a nominal rent Rs.1/-for 99 years from  PURNA SAHAKARI SAKHAR KARKHANA, BASMAT NAGER, Hingoli. The construction started in 1990 and  the then construction agency NPCC, NewDelhi has handed over the structures, Administrative Block, School Building, principal Residence, 12 staff residences and 12 single room accommodation , which are coming under I st Phase are handed over to the Vidyalaya Administration in 1995, and Vidyalaya shifted from  temporary Structures  in the year 1995.

 

The total vidyalaya campus was encircled by the compound wall in a phased manner.

 

S.NO

AREA/STRUCTURE

DETAILS

1

Boundary Wall

COMPLETED, TOTAL BRICK WALL, BUT THE ALL ABOUT 300 MEFTRES IS COLLAPSED DUE TO FLOODS IN 2002

2

Permanent buildings

 

INITIALLY  CBRI PATTERN LATER SWITCHED TO CPWD PATTERN

3

School building

  

 Completed, Under use, it is in CBRI pattern.

4

Dormitories

04 CBRI pattern providing accommodation for 160 boys AND 160 GIRLSin two tire system cotS.

02 boys CPWD pattern providing accommodation for 144 students.

One boys and one Girls dormitory is under construction in CPWD pattern.

5

Warden Residence

 

   NO Warden Residence  

 

 

S.NO

AREA/STRUCTURE

DETAILS

6

Kitchen/dining Hall-cbri pATTERN

 

Completed and fully operational. SINGLE SHIFT  IS ENOUGH AS THERE ARE TWO DINING HALLS

7

Principal Residence 

    01 No.-under use

8

Staff Quarters

 

 

Type III - 28 Nos.  ,Type II - 02 Nos.,Type I - NO,

NO GUEST HOUSE IS PROVIDED.

SP Sheds converted into Staff QRS.12 Nos.

9

M.P. Hall

Available

10

Workshop

 

Two workshops are available and used for GYM and Games & Sports Room.

11

Type of O.H. Tank ,

 Its capacity&

 Present Status

Column based :1.00 Lakh  litres

 Working satisfactorily

12

U.G. tank,Its capacity&

 Present Status

 50,000 litres

Working satisfactory

13

D.G. Set

 

 

 

 

1.Available:yes  ,Kirlosker make,:10 KV,

: Not in use :Year of procurement:1995

2- Silent Gen.Set- 25 KVA-Kirloskar Make.Working.

Year of procurement:2010

14

Sewage Pump

 No

15

Water Pump

05 HP capacity

16

Electrification

Electric connection

Sub Station building

Street lighting

 Numbers of hrs. during day when power supply is available on an average.

 

 

 Rural

Complete

Nos. of Poles-35

 

approximately 16 hrs.

  

 

 

S.NO

AREA/STRUCTURE

DETAILS

17

Playfields

 400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 available

o2  Nos.   – Available

O4 Nos.   – Available

 

18

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

 Potable,  O1  Nos.-  working

Potable, O6  Nos.-  working

 No water supply-

RO MINERAL WATER SUPPLY FOR STUDENTS IS INSTALLED

19

Rajiv Gandhi Smriti Van

 

 Available since 2007

20

Last date of cleaning of

(a)  Septic tank

(b)  Water tanks

 

APRIL-MAY-JUNE 2010

MAY 2011

21

Fire fighting arrangement

Working

22

Whether area around transformer is fenced

 Yes, FENCED 

23

Whether open wells, if any, are covered from top

 NO OPEN WELL IS IN CAMPUS

 

Maintenance and repair works of the vidyalaya

YEAR-2006-07

S.NO

AREA/STRUCTURE/

DETAILS

expenditure

1

PRINCIPAL RESIDENCE

FLOORING OF THE QUARTER

 

 

 

 

 

 

rs.4.5 LAKHS

2

VIDYALAYA PRINCIPALS OFFICE ,VICE PRINCIPALS OFFICE,SMART CLASSROOM,LIBRARY FRONT AREA

FLOORING OF THE ROOMS AND THE AREA

3

VIDYALAYA MAIN BUILDING

FIXED OF ALL CLASS ROOM DOORS, WHICH ARE DAMAGED

4

DORMETORIES

CONSTRUCTION OF COMPUND WALL OF  SENIOR BOYS DORMETORIES

5

VIDYALAYA MAIN BUILDING

FIXING OF CHANNEL GATES/COLLAPSABLE GATE OF MAIN GATE AND PRINCIPALS OFFICE SIDE GATE.